Bridge Repair Update – September 4, 2015

Stone Bridge

Support this blog, use my Amazon.com link for your online purchases.

The bridge looks great and is on schedule for traffic in mid-October.

Rebar
Rebar in place. The green color is the epoxy coating to prevent corrosion when encased in cement.
Bridge repair
Workers on bridge. On the right side of this photo will be a raised sidewalk (with curb) which will allow pedestrians a safe passage over the bridge.
Bridge repair
The device being suspended by the crane has a metal roller to smooth the cement after it is poured.
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s